Alom’s Concrete Crane Rail Sleeper Type K1- 32T: A proven system. .

SEARCH
24-01-2015

Tracktex, An effective, economical, easy-to-install replacement

‘Tracktex’ is a micro-porous filter sandwiched between two geotextile protectors which, when deployed at the base of ballast, prevents rain water penetrating through to the underlying formation but allows upward movement of water whilst filtering any fine soil particles.

This innovative material is lightweight & can be installed in a fraction of the time needed for a sandblanket or a sub-ballast layer.

 

MORE NEWS
18-02-2019

06-08-2018

New type anti- trespass panel certified by ProRail

Specifically designed to deter and delay access to prohibited areas, Rosehill Anti-Trespass panels are a proven physical and visual deterrent. This type of anti-trespass panel has been approved by ProRail spc 000287 version 2.

20-07-2018

28-05-2018

27-11-2017

21-08-2017

04-04-2017

Innovative Rail Crossing Systems

• Independent of sleeper spacing • Precise and secure • Cost effective • Rodded for extra strength • Quick & easy to install • No special tools required

23-11-2016

26-07-2016

Haags Startstation Erasmuslijn (HSE).

To have more space at the track, the E-Line has a new end stop named HSE ( The Hague start station Erasmus line) The HSE is the new metro stop which connects Rotterdam and The Hague.

06-06-2016

OV Saal

ProRail renews the track around Schiphol. Alom supplied for consortium “Nieuwe Meer” concrete sleepers type 140021.

05-04-2016

Amsterdam Metro – North-South Line - Netherlands

In the Dutch capital Amsterdam, the North-South Metro Line will run 9.7 kilometres from the residential area in the North to the office locations in the South.

11-03-2016

Alom's Concrete sleeper NS90

Alom's concrete sleeper NS90 has been tested and approved by ProRail SPC00021.

04-06-2015

Synthetic Railway Sleepers: Light, durable en strong

Alom offers , along with Sekisui, a Synthetic Railway Sleepers. These synthetic sleepers are produced by compressing single strands of glass fibre with polyurethane foam using a high pressure extraction press. The expected lifetime is more than 50 years.

24-01-2015

ABC rail fastening system in the Hague

Alom has finalized the ABC system, in good cooperation with HTM. The ABC system is already successfully applied on one of the most critical and frequently used section of the HTM network, with a total of 450 trams passing every day.

01-01-2015